Document review and approval is a project design, engineering and execution work process for the development of project results, documents and drawings.
After the initial document development and the necessary internal control and review processes to ensure adequate quality, C-Delta will provide a second opinion review for clarification by the Contractor. Part of the internal controls includes the correct documentation of the required design and control steps, ensuring critical safety and alignment with operational requirements and project specifications. We ensure that all contract, customer and legal requirements are met. The critical review of Contractor documentation will reduce risk and increase the value of the product delivered.